JSC RUSBURMASH has completed additional geological exploration of the Polmostundrovskoye deposit.

0 Comments

JSC RUSBURMASH has completed additional geological exploration of the Polmostundrovskoye deposit.

 

In the harsh climatic conditions of the Arctic, 66 wells with a total volume of 8,380 running meters were drilled. A complex of geophysical surveys was also carried out. To carry out the work at the deposit, a rotational camp was organized.

“The obtained results are necessary for the subsoil user to prepare and defend the report on the feasibility study of permanent exploration conditions and reserves calculation in the State Reserves Committee,” said Gleb Nosyrev, General Director of JSC RUSBURMASH.
JSC RUSBURMASH has completed additional geological exploration of the Polmostundrovskoye deposit.
JSC RUSBURMASH has completed additional geological exploration of the Polmostundrovskoye deposit.

December 21, 2023 Arctic Lithium JSC

 

Related Posts