9 May, 2023
0 Comments
he project for the development of the Polmostundrovskoye deposit involves the construction of a Crushing and Screening Complex.
- The expected capacity is 1 million tons of ore per year with a Concentrator Plant for the production of spodumene concentrate (with a lithium oxide content of 6%).
The concentrate produced at the deposit will be delivered to:
- Tula region (to LLC “Halmek Lithium”);
- Krasnoyarsk region (to JSC “CMP”);
For processing and production of ~18,000 tons/year of LCE (lithium carbonate equivalent).
- The obtained volumes are planned to be supplied to consumers in the territory of the Russian Federation. Possible surpluses will be sold for export.
May 9, 2023 Arctic Lithium JSC